Two Years Achievements of Ministry of Railways (May 2014 to May 2016)


DIGITAL INDIA AND pASSENGER AMENITIES INITIATIVES

Three social media platforms were established by Indian Railways on Facebook, Twitter and Also You Tube together with the handle @railminindia. Ministry of Railways used first of its sort, a real time 24×7 public grievance system and provided passengers that are travelling with medical, security and other emergency aid
Seek emergency help during journey and all India Security Helpline 182 set up to report any untoward incident
The All India Passenger Helpline ‘138’ provided during journey for all other query/complaints
A mobile based program viz. Grievance Management System (COMS) established
E-catering facility established at 100 stations. 408 railway stations designated for providing E-catering
A huge scheme for supplying Water Vending Machines (WVMs) to provide RO Water at affordableprices is under execution by Railway PSU IRCTC
Reservation quota of two lower berths per trainer in Sleeper class improved for Girls and Senior Citizens to four lower berths per coach
Tatkal reservation timings are staggered to function dual purpose of providing convenience to the passengers and for staggering traffic on the e-ticket portal. All representatives are debarred from reserving tickets during thirty minutes of opening of booking
Automatic refund of Supported /RAC etickets on cancellation of trains similar to waitlisted e-tickets is given without filing of TDR
Time limit for booking reserved tickets was raised to 120 days w.e.f. 01.04.2015
Destination alert and wake up alarm services established on 139
Automatic Destination Alarms through SMS for Rajdhani and Duronto trains to passengers.
E ticketing facility established for accredited journalist on concession pass as well as for disabled persons.
Mobile charging facilities in all new general class coaches started.
Out of 1252 Stations identified to Adarsh Stations’, 986 stations have up to now been developed. 160 developed in last two years
Scheme namely ‘SMS Gateway’ found enabling passengers to get SMS alerts on the status of reserved tickets
New Generation system may attend 2,00,000 enquiries instead of 50000 per minute and put in place which may reserve 7200 on-line tickets instead of 2000 tickets per minute
Rationalization of Computerized Passenger Reservation System (PRS) done to enable passengers to get tickets even after the preparation of reservation charts
Paperless unreserved ticketing including Paperless Platforms tickets through mobile phone introduced in suburban segments of Western Railway, Central Railway, South Central Railway, Southern Railway, Eastern Railway, South Eastern Railway
Pilot Project of hand Held Terminals for TTEs launched
E-booking of disposable linen started on trains at New Delhi Railway Station and Nizamuddin Railway Station, Mumbai Central (BCT), Chattrapati Shivaji Terminus (CSTM), Southern Railway
E-booking of Wheel chair found
Currency Coin cum Card used Automatic Ticket Vending Machines.
Began among the greatest free public wifi fi systems on earth. Launched at 26 stations with a plan to extend it to 100 Stations by December and to 400 stations by 2018.
The booking of retiring rooms at different railway stations made online which makes it convenient and transparent
E-Ticketing portal site in Hindi found
150 escalators and 60 lifts provided at Railway stations in last 2 years
Model Rake (a passenger carrying train with 24 coaches) developedwith enhanced interiors, colour scheme, aesthetics and amenity appointments. This is running as a train between New Delhi and Varanasi.
Cancellation of confirmed, RAC and Waitlisted PRS counter tickets made easy using IRCTC website or phone No. 139.
Provision made for approval of international debit and credit cards for payment of Eticket through IRCTC website
Yatri Ticket/Sewa Kendra (YTSK) Scheme established to permit private agents to operate ticketing terminals for selling booked in addition to unreserved tickets
Indian Railways began six pilgrims’ particular tourist trains. More such trains being planned in succeeding stages
Dustbins to be supplied in non AC coaches also
NIFT, Delhi has been engaged for designing of bedroll etc.
A brand new ‘Rail Neer’ plant for package drinking water set up at Ambernath (Mumbai).
To be able to increase availability of accommodation for general group passengers on long distance Mail/Express trains, GMs were delegated powers to de-reserve Sleeper Class (SL) coaches as General Coaches (GS) in identified trains & sectors
Suvidha Trains with pricing arrangement that is graded introduced for booking on PRS along with e tickets and facility of small refund on cancellation of ticket
The Defense Travel System to eliminate exchange of shield warrants was rolled out on the NGeT platform. Till date about 2000 Defense units have started issuing tickets through this stage without exchange of warrants
Amount of spots accessible for physically challenged has been raised from 2 to 4
‘VIKALP’, Alternative Train Accommodation System (ATAS) launched with a view to provide affirmed lodging to waitlisted passengers and to ensure optimal utilization of available accommodation. This facility is now available on New Delhi – Jammu, New Delhi – Lucknow, Delhi- Howrah, Delhi - Chennai, Delhi - Delhi and Mumbai -Secunderabad Circuits,
Established pre-cooked (prepared-to-eat) meals of reputed brands on some trains.
Commencement of supply of Braille signage on 3000 coaches has been given to be able to ease traveling to visually impaired passengers.
Supply of foldable ladder in First AC coaches launched


Provision of Bio degradable garbage bags to passengers started on pilot basis


Escorting women particular trains and women compartment by security squad


Security helpline 182 activated and real time grievance resolution through Twitter applied with a top priority to women security dilemmas


Fitment for girls security of CCTV surveillance cameras in trains originated with first such fitment undertaken in Amritsar-New Delhi-Shan-e Punjab Express


Development of security Program over a number of the Zonal Railways


Middle bay allowed for women


Pilot Project of Sale of Unreserved Tickets through Hand Held Terminals originated at Hazrat Nizammudin Railway Station of Northern Railway.
INFRASTRUCTURE CREATION AND SUPPORT TO MAKE IN INDIA INITIATIVE



Indian Railways has taken a giant leap forward in ‘Make in India’ drive by signing Understanding for setting up of Diesel Locomotive Factory (DLF) at Marhowra, Saran district, Bihar for procurement as well as maintenance of mainline most modern high power Diesel Electric Locomotives with M/s GE Diesel Locomotive Pvt. Ltd. A different deal signed for setting up of electric locomotive factory at Madhepura, Bihar for maintenance and procurement of most modern high power electric locomotives, both major PPP and FDI bids of Indian Railways. This could be among the greatest FDI’s in India amounting to order book of nearly Rs 40,000 Crore.


Process has been started by the Ministry for procuring high speed train sets which will improve average rate of passenger carrying trains thereby reducing journey time.


For Mumbai–Ahmedabad High Speed Rail Project using Shinkansen Technology, MoU between India and Japan signed. A new thing named National High Speed RaExtension of newly introduced cancellation facility for PRS
High Speed Rail Corporation Limited has been set up in February, 2016 to execute the project


Further high speed studies are being conducted by Ministry of Railways on Diamond Quadrilateral High Speed Rail network. Feasibility studies of Delhi- Mumbai, Mumbai- Delhi and Chennai - Kolkata are underway. The feasibility studies of Delhi- Mumbai and Nagpur –Nagpur hallways are being taken up with Chinese and Spanish governments through G2G alliance respectively


Ministry of Railways found Gatimaan Express, state’s first semi high speed train with a maximum speed of 160 kmph between Agra and Delhi heralding a new age of high speed rail travel in India


Redevelopment of 400 Stations to be developed on e-bidding on as is where is basis; 10 stations handed over to IRSDC


Indian Railways commissioned 2828 Km of Broad Gauge lines, highest ever in 2015-16 against a mean of 1528 Kilometers from 200914.


IR commissioned two mega bridges over river Ganga at Patna and Munger.With these, the Railway systems of North and South Bihar have now been incorporated.


The executions of the biggest infrastructural projects in the state, Eastern and Western DFCs have been fast-tracked. The Cabinet has accepted revised cost estimates and capital continues to be tied up. Rs.25,320 Cr worth of contracts have been awarded in the last two years, which is more than twice of the absolute contracts of Rs.12,240 Cr given since commencement. The first ever section on DFC of 56 kilometer between Durgawati Sasaram continues to be commissioned. The project is progressing nicely for commissioning in periods by 2019


Bela commissioned railroad Wheel Plant and routine production began


Diesel loco factory at Varanasi has been enlarged


DEMU factory at Haldia Mid-life and was commissioned Rehabilitation Workshop for trainers at Jhansi finished.


Some of the very most difficult railway jobs, conversion of 1500 V DC to 25000 V AC grip system continues to be successfully finished within the entire Mumbai division of Central Railway.


During 2014 16, 3105 course kilometres have now been electrified, which will be an average of 1552.5 RKM/ annum as against 1236 RKM/annum during preceding five years.



Building of Ancillary Unit, Electrical Lolo Assemblage & of CLW at Dankuni in West Bengal finished


Modern LHB Coach production facility commissioned at ICF Chennai.


The Chhapra factory has started regular creation of form wheels for rolling stock. The installed capacity of the plant is 1Lac wheels per annum.


Foundation stone laid for setting Traction Alternator Factory at Vidisha up to manufacture 100 traction alternators per annum of high horse power diesel locomotives which are currently being imported


In elimination of unmanned level crossing that has resulted in safe operations, significant increase. In 2015-16, a total of 1253 unmanned level crossings were eliminated and 1024 Road around/ Road under bridges were built. This marks an improvement of 35% against the average amount from 2009-2014


REFORMS

A Memorandum of Understanding with LIC of India for obtaining resources to the tune of Rs.1.5 lakh Cr signed.
MOF approved issue of tax free bonds by IRFC
Discussions started with World Bank for setting up a Railway Infrastructure Development Fund of around USD 30 Bn
Powers delegated and decentralized for improving transparency and efficiency. Measures for E-tendering, E-selling, E-ticketing, E-Governance, E-Cargo Demand, E-Catering, E-Wheel Chair, E Concierge etc. takenfor efficacy and transparency
Ministry of Railways (MoR) signed Memorandum of Understanding (MoU) for formation of Joint Venture Companies with six State Governments viz. Odisha, Maharashtra, Andhra Pradesh, Kerala, Chhattisgarh and Telangana.JVs would undertake job development works for an identified basket of endeavors, which will inter-alia include surveys, preparation of Detailed Project Report (DPR) and getting requisite approvals, processing for sanctioning of identified jobs and observation
Ministry of Railways conducted world’s greatest online assessment for recruiting for nearly 90 lakh aspirants. With a view to raise transparency, a brand new system of handing within the Question Pamphlets to the nominees continues to be introduced.A pilot project of uploading of Solution Keys and Cut off marks has also been initiated.
A consulting firm was engaged for studying the manpower rationalization of the Group A services. Report submitted and is under examination
Four Centres of Railways Research set up in premier educational institutions
Development of an online system originated for grievance redressal of both serving as well as retired railwaymen
Railways signed MoU to set up its Railway Design Centre in collaboration with National Institute of Design (NID)
For putting a regulator “Rail Development Authority” the method has been commenced. A concept note was uploaded for comments from all stakeholders. Procedure for drafting of a bill/executive order underway.
100 % FDI permitted on FDI developed in identified areas of sectoral guidelines and railway sector
Ministry of Railways implemented 100% E-procurement solution for all types of works contracts – goods and services. It isIndia’s greatest e-procurement system
A web-empowered IT-Application “Endeavor Tracking and Information System (PMIS)” launched which will probably be executed in Udhampur-Srinagar-Baramullah Rail Link (USBRL) endeavor, followed by other mega and complex jobs of Indian Railways. This increases transparency in undertaking observation
“Technology Mission on Indian Railways (TMIR)” for Development/Research/Innovations in Railway Technologies in association with Department of Science & Technology, MoHRD and representatives of Industry was set up
Development of Mobility Directorate
Development of Non-Fare Revenue Directorate in Railway Board’s Office
Release on Railway initiatives that are ‘ of Handout for Ease of Doing Nomination of ‘Key Customer Supervisors’ and Business’

17.12.16 11:21

Werbung


bisher 0 Kommentar(e)     TrackBack-URL

Name:
Email:
Website:
E-Mail bei weiteren Kommentaren
Informationen speichern (Cookie)

Die Datenschuterklärung und die AGB habe ich gelesen, verstanden und akzeptiere sie. (Pflicht Angabe)


 Smileys einfügen